Aquatic Maintenance Closures

Eastlink Centre

The City of Grande Prairie would like to remind residents of upcoming closures at the Eastlink Centre that are taking place to accommodate the annual maintenance schedule. The maintenance will take place between Saturday, August 25 through to Sunday, September 9. The full aquatic area will re-open on September 9 at 2:00 p.m.

What is not effected during the shutdown?
The 50m pool and the diving boards will remain open for public use at the standard operating hours.

What is effected during the shutdown?
August 25- September 9
The 25 m pool, lazy river, splash park, FLOWRider, waterslides and water features will be unavailable

The Eastlink Centre will be open for the Labour Day holiday on Monday, September 3 from noon – 5 p.m. The 50 m pool in the aquatic area will be open from noon - 4:30 p.m.

The 50m pool will be unavailable to public on Sunday, September 9th as we host the 2nd annual Eastlink Centre triathlon. For more information on the triathlon click here.

Completed Maintenance 
August 26-30
The water boiler will also be shutdown for maintenance, meaning there will be no hot water for showers or sinks.
August 27-29
The sauna and steam room will be closed for maintenance.